| The Rich Services design team offers the expertise
you need, all in one place. We can guide you through the entire
decision-making process, significantly reducing costs associated
with architecture and engineering fees. Our designers can make
educated recommendations that will not only reduce your installation
costs, but also the costs of operating and maintaining your systems
for years to come. Read the following case studies to see how
Rich Services can improve your bottom line:
Design / Build with Value Engineering
A. New Construction Project
Shore Toyota – Mays Landing, NJ
Overview – Prepared proposal
for plumbing, HVAC and mechanical project using owner’s
bid documents. Discussed budget concerns with owner and proposed
value engineering suggestions to redesign systems to best serve
the new facility and meet owner’s desired budget. Developed,
engineered and installed the following mechanical systems for
30,000 square feet of Sales, Office and Vehicle Service Areas.
1. Plumbing Systems
a. American
Standard commercial plumbing products.
b. Emergency
eye wash stations.
c. Oil and
Sand Interceptor systems.
2. Trane HVAC Rooftop Equipment
a. Showroom
with exposed spiral ductwork.
b. Office area
with multi-zone ducted systems.
3. Compressed air and distribution system for 15 service
locations.
4. Rooftop ventilation systems for service and office areas.
5. Underground vehicle exhaust and ventilation systems.
Project Outcome
| Owners Budget |
$400,000 |
| Competitive Bid Process |
over $420,000 |
| RICH Services Design / Build |
$365,000 |
| Savings to Owner |
$55,000 |
B. Renovation and Alteration
Berkley Condominium – Atlantic City, NJ
Scope of Work - Boiler and Hot Water System
Renovation for 160 unit 22 story building
Overview – Met with owner
to review annual operating expenses, fuel costs, breakdown maintenance,
general condition and lifecycle of 31 year old mechanical equipment.
Developed engineering study with Concord Building Solutions and
gave the owner a proposal that included in-kind equipment replacement
energy costs, new equipment costs, energy savings and energy rebates
that qualified for New Jersey Smart Start programs. The owner
agreed to replace all boilers, heat exchangers, controls and piping.
1. Demo of 16 Hydrotherm boilers installed in
1974 located in rooftop mechanical room. Existing cast iron boilers
with a 75% efficiency rating and Hydrotherm tube bundle heat exchangers
for domestic hot water.
2. Furnished and installed four new 1,000,000
BTU Hydrotherm state-of-the-art high efficiency boilers. These
new boilers deliver 20-100% modulation with a 94% efficiency rating.
That’s right 4,000,000 BTU’s at 94% efficiency.
3. Remove heat exchanger used to produce hot
water for swimming pool and install one Laars Teledynne high efficiency
pool heater.
4. Furnished and installed two 2,000,000 BTU
plate and frame heat exchangers for domestic hot water system
connected to existing 2,000 gallon storage tank.
5. Provide variable frequency drive (VFD) for
main corridor HVAC system and CO detector with thermostatic controls
to maximize energy savings during off peak hours.
6. Developed hot water piping system with 3-way
valves to take 2000 gallon domestic water storage tank off line
during winter months when occupancy is only 30%. Using the building
piping as the storage system for domestic hot water reduced costs
an additional 10%.
Project Outcome
Design/Build Proposal |
$220,000 |
Energy Rebates |
$27,000 |
Projected Annual Fuel Savings |
$96,000 |
First Year Savings for Owner |
$123,000 |
Projected Return on Investment |
2.2 years* |
*This does include additional savings for breakdown maintenance
Actual savings exceeded projected goals –
“We saved more money than we anticipated. We have asked
RICH Services to analyze our other mechanical systems to see if
we can save money on these items as well.”
Tony DeGrosa Manager of the Berkley Condominium
Projected ROI is now 1.8 years!

Plumbing Heating